Register and share your invite link to earn from video plays and referrals.

Search results for GW大感謝祭2024
GW大感謝祭2024 community
One keyword maps to one global community path.
Create community
People
Not Found
Tweets including GW大感謝祭2024
gw wassies where are we going this week?
GW Tachyon 🧪✨
0
116
69.6K
3.2K
Forward to community
100 GW/year of orbital solar-powered AI compute is an engineering equation, not a slogan. 1 Mt of payload to orbit annually at 100 kW/ton delivers it. Starship cadence of ~10 k flights/year closes the mass. By aircraft standards that cadence is modest; relative to today’s entire rocket industry it is transformative. This is the concrete path from power-constrained terrestrial data centers to continuous, radiation-hardened orbital compute at civilizational scale. Source I Elon Musk
Show more
$CRWV is targeting 8 GW across its whole portfolio by 2030. $NSCL aims to do that from one data center. Nscale filed its S-1 last week at a rumored $30B valuation with $103B in signed contracts. $88B of that is just Anthropic and $MSFT. That's 0.28x EV to backlog. $CRWV trades at 0.92x, $IREN at 1.54x and $NBIS at 1.72x. It's extremely early though as Nscale has just 55 MW live today, a fraction of its peers. The entire story here hinges on Monarch, a monstrous West Virginia data center running on a natural gas microgrid that accounts for 80% of the company's pipeline. @AsymmetricBets_ just did a deep dive into Nscale's S-1, and several things stood out to us. $NVDA is a supplier, customer, shareholder, lease guarantor and warrant holder. Nvidia even guarantees the $860M lease on Nscale's Texas site. Sheryl Sandberg and Fidji Simo joined the board this year. The software side is interesting too. In July it bought Anyscale for $1.65B in an all stock deal. Those are the creators of Ray, the open source framework with 740M+ downloads running AI workloads across thousands of GPUs. Risks are massive too and active capacity compared to peers leaves much to be desired. Execution track record is basically non-existent, as all capacity today is co-located or leased. A plan to power the whole thing using Caterpillar gensets feels like a good short term solution, but backlogs and delays with Cat have been persistent, and engines are typically just bridge power until a grid interconnect is available. The company's huge bet on one single location leaves it exposed to local opposition. Mason County residents organized a protest in March and over 900 people filed comments opposing the project. State inspectors already flagged dust violations at the site in May. Full deep dive out now:
Show more