Register and share your invite link to earn from video plays and referrals.

Search results for KIBOW
KIBOW community
One keyword maps to one global community path.
Create community
People
Not Found
Tweets including KIBOW
RT @enyahourhawa1: 150 cartons of Spaghetti. 1 big heart💚 Big thanks to KIBOKO ENTERPRISES LTD for partnering with UOX on #10KForKaramoja…#
China's peak power load hit a fresh record high on Friday, the fourth such record since the start of this summer, reaching 1.56 billion kilowatts, the National Energy Administration (NEA) said. This figure is 4.8 million kilowatts higher than the previous record, the NEA revealed, attributing the surge in power consumption to high temperatures and steady economic growth.
Show more
I am the Director of Voluntary Cessation at the Department of the Interior. Last month I paid a German company $1.2 billion to build nothing. Not a turbine. Not a wire. Not one kilowatt. $1.2 billion. For the absence. The company is RWE. They held leases off California. Off Louisiana. In the New York Bight. Wind farms were going there. Now they aren't. I made sure of that. We call it voluntary. It became voluntary when I made it impossible. I write the permits. I never wrote theirs. RWE said it kindly. "No path forward to permit these projects for the foreseeable future." I am the foreseeable future. Here is the part I like. The $1.2 billion did not go to a taxpayer. It went to RWE. We paid them to leave. Then they took the check and put $900 million into a gas terminal in Louisiana. We paid a company to stop making power. They used it to make a different kind. The check bought a fuel switch. I signed it. Somewhere a set of blades is already built. They point at a different ocean now. The ports that would have raised them can go back to waiting. An analyst asked me what the country got for $1.2 billion. I said "energy security." She asked which energy. I said "the secure kind." She asked to see the kilowatts. I told her that was not her lane. She stopped asking. I do not produce power. I have never produced power. I end the projects that would. My title is Voluntary Cessation. Cessation means stop. Voluntary means I get to call it their idea. The Germans are the second. In March it was a French company. Same handshake. Leases traded for an LNG plant in Texas. There is a line forming. I take a number. I pay it to leave. We call it common sense. We call the wind a costly subsidy. I just paid $1.2 billion to end the subsidy. The payment was larger than the subsidy. I am the subsidy now. On the invoice, under deliverables, I wrote one word. None. I came in under budget. I'm up for a raise. The lights those turbines would have carried are still off. They were always going to be off. That was the product.
Show more
Ecological Dongying | Green electricity makes up almost 70% of installed capacity! Dongying entered the ranks of cities with over 10 million kilowatts of green #electricity#.🌿🌿 As of the end of June 2026, #Dongying# City of #China# registered an installed capacity of 10.98 million kilowatts of renewable #energy#, a year-on-year increase of 10%, accounting for 69% of the city's total installed capacity, officially entering the ranks of cities with over 10 million kilowatts of #greenelectricity#. In terms of installed capacity structure, the city’s photovoltaic power installed capacity stands at 7.61 million kilowatts, wind power at 3.15 million kilowatts, and #biomass# power at 207,800 kilowatts. A diversified and coordinated renewable energy layout integrating wind, solar and biomass energy has basically taken shape. The expanding clean power capacity continuously delivers green momentum for industrial production and residential energy use, steadily lowering the #carbonemission# intensity of city development. #RenewableEnergy# #EcologicalDongying# #AmazingDongying# #YellowRiverDelta#
Show more
🇺🇸 Trump on NATO: "I called you TWO MONTHS AGO and you did nothing, so no, you can't sit with us."
The TeraFab Scale To reach a terawatt of AI compute output per year, SpaceX needs a chip factory at a scale that does not exist. That is the TeraFab. Elon Musk on the size: ~ 100 million square feet of factory floor ~ 10x larger than the entire Tesla Gigafactory Texas ~ Designed to produce one billion full-reticle chip equivalents per year ~ Each chip producing roughly one kilowatt of compute For context, current global AI chip manufacturing tops out at around 100 gigawatts per year of total compute. The TeraFab is built for 1000 gigawatts. That is 10 times the current global capacity, from a single facility.
Show more
A new nuclear power unit using Hualong One, a domestically designed third-generation nuclear reactor, began commercial operation on Monday in south China's Guangdong Province, according to China General Nuclear Power Corporation (CGN). The commissioning of the No.2 unit marks the completion and full operation of the first-phase project of the Taipingling nuclear power plant, the first nuclear project in the Guangdong-Hong Kong-Macao Greater Bay Area to deploy Hualong One technology. The No.1 unit of this project became operational in April this year. The two units are expected to generate over 18 billion kilowatt-hours annually, enough to provide power for nearly 2 million people, and cut carbon dioxide emissions by 16.63 million tonnes per year, according to Zhang Guoqiang, chairman of CGN Huizhou Nuclear Power Co., Ltd.
Show more