Register and share your invite link to earn from video plays and referrals.

Search results for 2044、
2044、 community
One keyword maps to one global community path.
Create community
People
Not Found
Tweets including 2044、
The year is 2044. Bitcoin is $2.7 million. Your uncle is explaining at Thanksgiving that it’s still “too volatile.” He owns: $14,000 of Bitcoin $187,000 of home equity a bass boat three commemorative silver coins and $46,000 of Ford stock because “America isn’t going anywhere.” He is extremely concerned about your portfolio.
Show more
RECKITT HAS ANNOUNCED THE PRICING TERMS FOR ITS PREVIOUSLY ANNOUNCED ANY-AND-ALL TENDER OFFER AND CONSENT SOLICITATION FOR MEAD JOHNSON NUTRITION COMPANY NOTES DUE 2044, WITH HOLDERS TO RECEIVE $898 PER $1,000 PRINCIPAL AMOUNT PLUS ACCRUED INTEREST.
Show more
BREAKING: TeraFab secures two major Texas agreements for Phases 2 and 3, representing nearly $48 billion in investment. The previously announced $16.8 billion figure applied only to TeraFab’s initial Phase 1. These new agreements cover the Anderson-Shiro portions of the next two phases. • The agreements cover the Anderson-Shiro CISD portions of TeraFab Phases 2 and 3. Both became effective on August 18 and were posted by the Texas Comptroller on August 21. • The official applications project $23,838,288,600 of investment for each, or $47,676,577,200 combined. That includes approximately $18.78 billion in buildings and real property plus $28.90 billion in machinery and equipment. • Phase 2 construction is scheduled for 2029-2031, followed by Phase 3 from 2032-2034. Each plans approximately $7.53 billion, $8.09 billion and $8.22 billion of investment across its three construction years. • The filings describe TeraFab as a SpaceX-planned, vertically integrated semiconductor facility led by affiliated technology companies including Tesla, SpaceX and xAI. The broader four-phase plan is estimated at approximately $119 billion. • TeraFab aims to bring chip design, photomask production, wafer fabrication, advanced packaging and system integration together on one Texas campus, including sub-2-nanometer-class technology, supporting power generation and a space-compute test facility. • Each of these two portions is projected to create 617 direct permanent jobs, bringing the combined projection to 1,234. Each is also estimated to support 2,185 total jobs statewide when indirect and induced employment is included. • Each three-year build is estimated to support an annual average of 11,316 direct construction jobs, or 14,562 jobs when indirect and induced work in Grimes County is included. • Projected average salaries are $168,924 when Phase 2 begins operations in 2032 and $179,264 when Phase 3 begins in 2035. Estimated direct annual payroll is $104.23 million and $110.61 million, respectively. • The two economic-impact studies collectively project approximately $5.36 billion in state and local tax revenue across their respective 38-year analysis periods. This includes about $2.49 billion for Anderson-Shiro CISD and $1.45 billion in property taxes for Grimes County itself. • For newly eligible property, the taxable value used to calculate Anderson-Shiro CISD maintenance and operations taxes will be zero through construction completion and 50% of market value during each 10-year incentive period: Phase 2: 2032-2041 Phase 3: 2035-2044 • This is not a blanket exemption from all taxes or a direct cash payment. County taxes, school debt-service taxes, land, inventory and existing property remain outside the limitation. • The Texas Comptroller concluded that each phase should generate enough state and local tax revenue over 20 years to offset the school M&O revenue lost under the agreement. The applications also state that the incentive was decisive in choosing Texas after locations in Arizona, New Mexico and Nevada were considered. • Each contract separately requires at least $20 million of eligible investment and 10 qualifying jobs. These are legal compliance minimums, not the much larger project forecasts. • The required jobs cannot be counted under both agreements. They must be new, primarily on-site, full-time positions of at least 1,600 hours annually, with average wages of at least $66,668. TeraFab must also offer and contribute to employee health coverage. • Each agreement is backed by a $33,583,540 performance bond or guarantee, totaling $67,167,080. Public compliance reports, audits and site inspections are required, while failures can trigger penalties, termination and recovery of lost tax revenue plus interest.
Show more
0
40
805
124
Forward to community
NASA is seeking Starlink on one of its high-altitude airborne sensor platforms NASA Langley is seeking a Starlink Aviation Performance Kit capable of maintaining high-speed connectivity at 50,000+ feet The requirements include: • 135–310 Mbps download • 20–44 Mbps upload • Latency below 99 ms • Operation at 50,000 feet or higher • Compatibility with FAA-approved Gulfstream installations The goal is to live-stream high-resolution imagery from research flights directly back to teams on the ground That means scientists can receive and analyze data while the aircraft is still in the sky instead of waiting for the mission to end Starlink is now being pulled into another seriously demanding use case: real-time scientific data from 50,000+ feet
Show more
🇺🇸 US Visa rejection rate in 2025: 🇲🇨 Monaco - 0% 🇦🇪 United Arab Emirates - 2.17% 🇯🇵 Japan - 5.68% 🇨🇭 Switzerland - 5.82% 🇸🇦 Saudi Arabia - 5.98% 🇦🇷 Argentina - 7.47% 🇲🇾 Malaysia - 7.92% 🇫🇷 France - 9.67% 🇮🇱 Israel - 11.32% 🇵🇱 Poland - 11.63% 🇿🇦 South Africa - 11.66% 🇩🇪 Germany - 12.22% 🇮🇹 Italy - 12.65% 🇨🇱 Chile - 16.38% 🇫🇮 Finland - 18.09% 🇨🇳 China - 20.21% 🇬🇧 United Kingdom - 20.44% 🇵🇪 Peru - 20.90% 🇲🇽 Mexico - 21.36% 🇸🇪 Sweden - 21.77% 🇮🇳 India - 22.04% 🇻🇳 Vietnam - 22.08% 🇹🇷 Turkey - 22.25% 🇪🇸 Spain - 23.67% 🇰🇷 South Korea - 24.73% 🇹🇭 Thailand - 25.67% 🇮🇩 Indonesia - 26.69% 🇲🇦 Morocco - 26.91% 🇵🇭 Philippines - 30.76% 🇰🇵 North Korea - 33.33% 🇺🇦 Ukraine - 33.92% 🇹🇿 Tanzania - 39.41% 🇷🇺 Russia - 40.38% 🇪🇬 Egypt - 47.61% 🇻🇪 Venezuela - 48.22% 🇩🇿 Algeria - 51.23% 🇰🇿 Kazakhstan - 51.75% 🇵🇰 Pakistan - 52.32% 🇺🇿 Uzbekistan - 52.46% 🇨🇦 Canada - 53.10% 🇳🇬 Nigeria - 57.00% 🇮🇷 Iran - 62.44% 🇦🇫 Afghanistan - 63.25% 🇲🇲 Myanmar - 64.19% 🇬🇭 Ghana - 64.34% 🇾🇪 Yemen - 67.98% 🇰🇪 Kenya - 68.23% 🇳🇵 Nepal - 69.47% 🇧🇩 Bangladesh - 61.45% 🇫🇲 Micronesia - 100% Note: business (visa category B-1), for tourism (visa category B-2), or for a combination of both purposes (B-1/B-2).
Show more
0
135
1.9K
149
Forward to community
This 3 minute UFO recording was submitted to the National UFO Reporting Center (NUFORC) following a report from a witness in Cookeville, Tennessee, USA. The footage was recorded from the witness's home using a night vision monocular on 21 August 2026. The witness reported that an object entered the camera's field of view, moved north, then south, and later west, before moving away over a tree line. The witness reported being unable to see the object with the naked eye and only observing the anomaly through the night vision device. NUFORC's investigation classified the case as Tier 4, citing technical/optical effects producing the anomaly observed in the video. The investigation report also notes that the footage and accompanying information were reviewed with technical consultation from Marian Rudnyk, identified in the report as a former NASA astronomer, planetary scientist and space imaging specialist. Witness Testimony: "Watching the skies on a Friday night from my backyard and an object came into frame, floated around for 3 minutes, made aggressive moves occasionally, then floated away over a tree line. I wasn't able to see it with my naked eye." Location: Cookeville, Tennessee, USA Viewing direction: Northeast, overhead, then west Date: 21 August, 2026 Time: 20:44 local time Reported sighting duration: 3 minutes Shape reported: Circle Estimated size: More than 2 feet possibly Angle of elevation: 65 degrees Heading: North, then south, then west Estimated speed: Slow to a hover Recording equipment: Night vision monocular Source case: NUFORC UFO Sighting #200409# Witness/camera operator: Unidentified Source: NUFORC (NUFORC Sighting #200409#) NUFORC #200409# Investigation Report (pdf)
Show more