Register and share your invite link to earn from video plays and referrals.

Search results for AR30
AR30 community
One keyword maps to one global community path.
Create community
People
Not Found
Tweets including AR30
🔥 Spot Sale: ANTRACK AR30 Hydro-cooling cabinet for ANTMINER ✨ Turn available power into ₿ BTC — Scale rack by rack! Package Details ✅ • Product: ANTRACK AR30 • Capacity: 20 U2H miners • Power: 200 kW • Input: 380–480 V • Rack: 47U • Connection: Connects to your existing cooling system • Price: $16,000 /set Ideal for ✅ • Small mining sites • Mine expansion • Data centers 🕒 Sales start on Thursday, September 10 at 9:00 AM (ET) 🚚 Ships within 45 business days after order placement 📧 antrack@bitmain.com | #BITMAIN# #ANTMINER# #ANTRACK# #AR30# #HydroCooling# #SpotSale#
Show more
Spot Sale: ANTRACK AR30 Hydro-cooling cabinet for ANTMINER Package Details Product: ANTRACK AR30 Capacity: 20 U2H miners Power: 200 kW Input: 380-480 V Rack: 47U Connection: Connects to your existing cooling system Price: $16,000 /set antrack@bitmain.com | BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN# #ANTMINER# #ANTRACK# #AR30# #HydroCooling# #SpotSale#
Show more
Ex-Super Bowl champ gets early release from prison to be with 8-year-old daughter dying of cancer
⏰ ANTMINER S23e U2H Limited-Time Special Price — 3-Day Countdown ⚡ 865T hashrate, 10 J/T efficiency. 2U rack-ready, 50% off for a limited time, plug-and-play. 🔧 Covering deployment scenarios from cabinet to container: 🔹 MW-scale mining sites can pair with ANTSPACE HW7 hydro-cooling container 🔹 Smaller-scale sites: pair with ANTRACK AR30/AR31 hydro-cooling cabinets 🔹 Pair with ANTCOLDSTORAGE (ACS) — 8GJ cold storage capacity, supports ambient temperatures up to 55°C, zero operating water consumption. S23e U2H + ACS ensures stable, uninterrupted operation even in hot, water-scarce environments. 💳 Limited-time 50% off: Promotion ends September 27, 2026 🚚 Shipping: November 2026 – January 2027 BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN# #ANTMINER# #S23eU2H# #ACS# #ANTSPACE# #HW7# #ColdStorage# #HydroCooling# #50OFF# #LimitedTimePromo# #Countdown#
Show more
⏰ ANTMINER S23e U2H Limited-Time Special Price — 7-Day Countdown ⚡ 865T hashrate, 10 J/T efficiency. 2U rack-ready, limited-time 50% off , plug-and-play. 🔧 All-in-one deployment with multiple cooling options: 🔹 ANTSPACE HW7 — Next-gen 40ft hydro-cooling container, $169,000/unit, 2MW cooling capacity, holds 242x S23e U2H, PUE as low as 1.031, stable operation from -40°C to 50°C 🔹 ANTRACK AR30 Hydro-Cooling Cabinet — $16,000/unit, connects to existing cooling systems, holds 20x S23e U2H per cabinet 🔹 ANTRACK AR31 Hydro-Cooling System — $20,000/unit, holds 20x S23e U2H, independent dry cooler + heat recovery 💳 Limited-time 50% Off:valid through September, 2026 🚚 Shipping: November 2026 – January 2027 BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN# #ANTMINER# #ANTRACK# #AR30# #AR31# #ANTSPACE# #HW7# #HydroCooling# #50OFF# #LimitedTimePromo# #Countdown#
Show more
Every liter of 95 unleaded you pump in South Africa today costs R30.25, and the South African government deliberately set that price. R7.46 of that liter is pure state extraction: the fuel levy at R4.29, the Road Accident Fund levy at R2.25, and the slate levy at R0.88. The slate levy exists because the government's own pricing formula periodically undershoots the real cost of imported fuel. Rather than scrap the formula, the state runs a tab and then charges you to settle it. You pay for the government's own accounting failure. We feel the tax burden every time we refill at the pump, but the structural damage underneath it is even worse. South Africa produced 78% of its own fuel in 2019. It produces 39% today. Decades of regulatory uncertainty made a R30-billion rebuild unthinkable for private operators. Sapref closed after the 2022 floods because of that uncertainty. Engen's refinery burned, and nobody rebuilt it. When the state crowds out private investment through price controls, forced margins, and opaque procurement rules, refineries don't get rebuilt; they just close. Botswana, which routes 60% of its fuel through South Africa, pays R22.47 a liter for the same 95 octane grade. That's R7.80 cheaper, downstream of the source. The price difference is largely the levy stack SA's government imposes. The "Central Energy Fund" now wants R117 billion to rebuild Sapref under state ownership, with no confirmed funding and no timeline. The country that drove private refiners out through overregulation now proposes to replace them with a state project. The minimum wage worker earning R30.23 an hour buys exactly one litre with an hour's labour. An American on the federal minimum buys six. That gap reflects decades of compounding policy failure, from the rand's destruction to the refinery closures the state enabled and the taxes it layered on top. Prices carry information. When the state overrides them, you carry the cost.
Show more