Register and share your invite link to earn from video plays and referrals.

Search results for Anomin
Anomin community
One keyword maps to one global community path.
Create community
People
Not Found
Tweets including Anomin
{ anomie } [new_collection_loading]
⏰ ANTMINER S23e U2H Limited-Time Special Price — 3-Day Countdown ⚡ 865T hashrate, 10 J/T efficiency. 2U rack-ready, 50% off for a limited time, plug-and-play. 🔧 Covering deployment scenarios from cabinet to container: 🔹 MW-scale mining sites can pair with ANTSPACE HW7 hydro-cooling container 🔹 Smaller-scale sites: pair with ANTRACK AR30/AR31 hydro-cooling cabinets 🔹 Pair with ANTCOLDSTORAGE (ACS) — 8GJ cold storage capacity, supports ambient temperatures up to 55°C, zero operating water consumption. S23e U2H + ACS ensures stable, uninterrupted operation even in hot, water-scarce environments. 💳 Limited-time 50% off: Promotion ends September 27, 2026 🚚 Shipping: November 2026 – January 2027 BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN# #ANTMINER# #S23eU2H# #ACS# #ANTSPACE# #HW7# #ColdStorage# #HydroCooling# #50OFF# #LimitedTimePromo# #Countdown#
Show more
⏰ ANTMINER S23e U2H Limited-Time Special Price — 7-Day Countdown ⚡ 865T hashrate, 10 J/T efficiency. 2U rack-ready, limited-time 50% off , plug-and-play. 🔧 All-in-one deployment with multiple cooling options: 🔹 ANTSPACE HW7 — Next-gen 40ft hydro-cooling container, $169,000/unit, 2MW cooling capacity, holds 242x S23e U2H, PUE as low as 1.031, stable operation from -40°C to 50°C 🔹 ANTRACK AR30 Hydro-Cooling Cabinet — $16,000/unit, connects to existing cooling systems, holds 20x S23e U2H per cabinet 🔹 ANTRACK AR31 Hydro-Cooling System — $20,000/unit, holds 20x S23e U2H, independent dry cooler + heat recovery 💳 Limited-time 50% Off:valid through September, 2026 🚚 Shipping: November 2026 – January 2027 BITMAIN remains committed to consistently delivering better products and services to its clients. #BITMAIN# #ANTMINER# #ANTRACK# #AR30# #AR31# #ANTSPACE# #HW7# #HydroCooling# #50OFF# #LimitedTimePromo# #Countdown#
Show more
The Antminer S21j XP Hydro: •  100% bonus depreciation under Section 168 •  Hosted in Blockware facilities, fully managed •  BTC Cost of Production: ~$49,000 •  Most efficient Bitcoin miner on the market at 12 W/TH Email sales@blockwaresolutions.com to pre-order (Limited Availability, Act Fast!)
Show more
✦ XL ✦ Abominations in Wasteland 🚩
0
170
510
62
Forward to community
🚀Coming Soon: HOST ANTMINER S21e XP Hyd. ❄️ One-Click Mining, BTC at Your Fingertips ✅ No Set Up, No Hassle ✅ No Power Cost — Pay Once, Earn BTC Daily ✅ Daily Payouts — Keep 100% of Your Mined BTC ✅ Own Your Rig — Claim Your Miners After Mining ⚙️ 430T | 5,590W | 13J/T 📅 Sales start on Aug 29 🔗 Learn more:(
Show more
To properly anoint her history-making new album Confessions II—which saw her become the first artist to have number ones in four different decades—Madonna and her collaborators took over the Knockdown Center for a cardio-heavy five-hour set on Saturday into Sunday.
Show more
Nvidia CEO Jensen Huang has never anointed a successor, but many analysts and investors see two people as particularly likely candidates: Nvidia's uber-engineer Ian Buck and Chief Financial Officer Colette Kress who is now interim CEO
Show more