登録して招待リンクを共有すると、動画再生報酬と紹介報酬を獲得できます。

Mike Baier
@Mike__Baier
Removing traffic from the world one tunnel at a time. Director of Production, Electrical, and Software Engineering at The Boring Company
参加 March 2020
731 フォロー中    6.1K ファン
Every Prufrock that leaves the factory has over 1,000 changes from the one before it. Before it ships, we put it through a full Porpoise Test (PT) in Bastrop — a short test tunnel (typically under 200 rings) that lets both the design team and the test team gather real data on the new designs and on the specific Prufrock serial number. To date, we’ve completed six of these tests and Prufrock 5 is currently 200 rings into PT7. Once complete, the tunnels are put to use: • PT4 is now a vacuum tunnel for Hyperloop testing • PT5 is a live test bench for liner trucks and new belt systems • PT6 is a pedestrian tunnel connecting SpaceX to Hyperloop Plaza With porpoise testing, our engineers get to get hands on and stress-test every one of their designs in real world environments without ever leaving Bastrop. We are currently hiring Electrical, Mechanical, Test, and Software engineers. Link to apply in the comments below 👇
もっと見る