登録して招待リンクを共有すると、動画再生報酬と紹介報酬を獲得できます。

Mike Baier
@Mike__Baier
Removing traffic from the world one tunnel at a time. Director of Production, Electrical, and Software Engineering at The Boring Company
参加 March 2020
767 フォロー中    7.1K ファン
If you’re inside Prufrock while it’s mining, you never really see dirt. The only dirt is on the conveyor over your head. In front of you: the stationary shell (pictured below). Behind you: a finished tunnel. There’s a watertight seal between the inside of the TBM and the outside world. Without it, tunneling under the water table wouldn’t be possible.
もっと見る