๊ฐ€์ž… ํ›„ ์ดˆ๋Œ€ ๋งํฌ๋ฅผ ๊ณต์œ ํ•˜๋ฉด ๋™์˜์ƒ ์žฌ์ƒ ๋ฐ ์ดˆ๋Œ€ ๋ณด์ƒ์„ ๋ฐ›์„ ์ˆ˜ ์žˆ์Šต๋‹ˆ๋‹ค.

Joe Tegtmeyer ๐Ÿš€ ๐Ÿค ๐Ÿ›ธ๐Ÿ˜Ž
@JoeTegtmeyer
CFI pilot. Drone videos about Giga Texas & Starbase. Interested in all things space related! Mayor of Cyber Beach!
๊ฐ€์ž… July 2020
902 ํŒ”๋กœ์ž‰ ์ค‘    102.5K ํŒฌ
14 October 2026 Giga Texas VIDEO โ€ฆ Pre-dawn flight today to capture more of the site in the dark, highlighting just how much activity there is with both regular production (employees were arriving for their shift start) & construction, which is pretty much 24/7 on the site. At the Optimus factory we get great views inside the structure that is now ~40% assembled! The main steel assembly may be complete within 6 months! On the E side of the main factory, the Vertical Reciprocating Conveyor system has some of the mechanicals & one of the red loading/elevator lifts installed. Over at the W side of the highway, the large lot that has been graded near Tesla Rd is getting a large section paved with asphalt. Finally, just S of the EOL facility, 3 banks for new superchargers is making fast progress!
๋” ๋ณด๊ธฐ