๊ฐ€์ž… ํ›„ ์ดˆ๋Œ€ ๋งํฌ๋ฅผ ๊ณต์œ ํ•˜๋ฉด ๋™์˜์ƒ ์žฌ์ƒ ๋ฐ ์ดˆ๋Œ€ ๋ณด์ƒ์„ ๋ฐ›์„ ์ˆ˜ ์žˆ์Šต๋‹ˆ๋‹ค.

Marcus House
@MarcusHouse
I like space stuff. You can support what we do at or pick up some merch at
๊ฐ€์ž… April 2016
732 ํŒ”๋กœ์ž‰ ์ค‘    214.7K ํŒฌ
Nose testing continues. ๐Ÿ‘ƒ
S43.1 at Massey's, with an impressive array of equipment rigged up inside the structural test cage. A large beam placed over the top supports four hydraulic cylinders linked to catch/lift hardware (yellow arrows). Another cylinder is pinned to a beam, applying loads to one side of the cone (orange arrow). Two frames are linked to the flap hardware for applying forces on the linkage hardware (red arrows). A pair of chopstick simulator beams apply a clamp force to the 9-meter tank section (green arrows). Internally, a large trapezoid frame is likely testing the Pez dispenser base frame that attaches to the forward dome, possibly testing forces it would see during a fully loaded Starlink v3 mission. Thanks to @MarcusHouse @lifeatstagezero for the progress shots.
๋” ๋ณด๊ธฐ