Removing traffic from the world one tunnel at a time. Director of Production, Electrical, and Software Engineering at The Boring Company
가입 March 2020
731 팔로잉 중    6.1K
Right now, only a small percentage of the Vegas loop is open and we already do about 40,000 passengers a day on a busy convention day, which is more than the majority of light rail systems in the US.  In a few months we will open the airport connector tunnels, which are two of the longest transportation tunnels built in the US in the last 25 years, and we believe ridership will 3x-4x as a result. At that point Vegas loop would be in the top 10 of public transportation systems in the US based on ridership (and on its way to top 3 or 4 as we open more and more of the system).