가입 후 초대 링크를 공유하면 동영상 재생 및 초대 보상을 받을 수 있습니다.

Jukan
@jukan05
가입 September 2024
450 팔로잉 중    226.3K 팬
TrendForce: GPU lead times are 30–45 weeks, with the upper end of the range up 5 weeks from the previous week. DRAM lead times have shortened to 19 weeks, down 1 week from the previous week. MLCC lead times have extended to 38 weeks, up 3 weeks from the previous week.
더 보기