8月5日长赣高铁捞刀河特大桥首个连续梁0号块完成浇筑,进入上部结构施工阶段。
On August 5, the first continuous beam segment (Block 0) of the Laodao River Grand Bridge on the Changsha-Ganzhou High-Speed Railway was successfully poured, #Railway#
2006年青藏铁路格拉段通车后,青藏铁路与布达拉宫紧密相连。
The Golmud-Lhasa section of the Qinghai-Tibet Railway opened in 2006, closely linking the railway with the Potala Palace. #Railway#