Tell me $TSLA is just a car company. 🚗
1. Fremont (CA) — Original plant. Bought $42M in 2010. Produces the 3/Y. 5.5M sq ft.
2. Giga Shanghai — 3/Y export hub. Opened 2019. $2–7B cost. 4.5M sq ft.
3. Giga Berlin — Model Y + cells. Opened 2022. 4–5B cost.
4. Giga Texas — HQ. Y, Cybertruck, Cybercab, Optimus, 4680s. Opened 2022. $10 billion+. 10M sq ft.
5. Giga Nevada — Batteries, motors, Semi, Powerwall. Opened 2016. $6.2B by 2023.
6. Giga New York — Solar Roof, Superchargers. Buffalo.
7. Kato / Fremont cells (CA) — 4680 pilot next to Fremont.
8. Tesla Lithium (Robstown, TX) — Hydroxide refinery. Live 2026. $1 billion. 50 GWh.
9. Megafactory Lathrop (CA) — Megapack. Opened 2022.
10. Megafactory Shanghai — Megapack. Opened 2025.
11. Megafactory Texas (Brookshire) — Megapack 3. Live Aug 2026. $200 million. 50 GWh.
12. Parts shops — Tilburg, Germany automation, MN/IL/Canada, Shanghai Superchargers.
13. Project Crystal Sun (Fort Bend, TX) — Solar cells/modules. $10.1 billion. Build 2026–28. Projected operating in 2029.
14. Terafab (Grimes County, TX) — Tesla + SpaceX chips. Phase 1 $16.8 billion. Started already in 2026. Long term chip manufacturing for US.
15. Giga Texas optimus Giga factory - Optimus humanoid robots. 7 million sq feet. $8-$10 billion.
16. Giga Texas Cortex 1-2 - AI training for FSD, Optimus and Robotaxi. 630 MWs. $15 billion cost.
17. Giga Texas terafab - AI chip manufacturing testing and small batch production. 2 million sq ft. $3 billion cost.
I wonder what else $TSLA will be building in the future? 🤔
显示更多