注册并分享邀请链接,可获得视频播放与邀请奖励。

Mike Baier
@Mike__Baier
Removing traffic from the world one tunnel at a time. Director of Production, Electrical, and Software Engineering at The Boring Company
加入 March 2020
762 正在关注    7K 粉丝
Help us build the future.
Prufrock builds tunnel rings fully autonomously. Six concrete segments (~3,750 lb each), are lifted, translated and placed into final position. That's the weight of a Tesla Model 3, placed with millimeter precision in < 1 minute, monitored remotely from the Global OCC in Texas.
显示更多
0
10
308
23
转发到社区