注册并分享邀请链接,可获得视频播放与邀请奖励。

John Intel
@intelfabs
God First. Intel and Terafab are cool
加入 May 2026
202 正在关注    6K 粉丝
The North American data center pipeline is now 404 GW. At current build rates It would take 13.1 years to clear it, a new high Also a new high is the stranded capacity (delayed + cancelled + not approved/withdrawn) It jumped +6.5 GW in August, more than the +4 GW that actually entered construction. That pushed stranded capacity to 12% of the pipeline. Power, permits, and politics decide what actually gets built.
显示更多