註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

Aethir
@AethirCloud
Powering the Future of AI. Building Decentralised Cloud Compute Infrastructure.
加入 May 2022
202 正在關注    673K 粉絲
CoreWeave reported about 1.5 GW of active power at the end of Q2 2026, compared with roughly 3.7 GW contracted. That is one of the strongest operators in the sector, and more than half of its contracted power was still waiting to run. Across AI infrastructure, the headline number and the rentable number keep drifting apart, and buyers end up planning against the wrong one. Aethir ACCELERATE is measured on capacity that goes live: We plan to deploy mid-sized sites designed to move from site selection to running B300 and GB300 clusters in months. Count what runs.
顯示更多
0
60
101
12
轉發到社區