註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

Cully Cavness
@Electron_Cowboy
Co-Founder, President and Chief Strategy Officer of @CrusoeAI
加入 July 2019
840 正在關注    6.1K 粉絲
Attacking the critical path - medium voltage switchgear is one of the longest lead times in the AI infrastructure supply chain, so @CrusoeAI has vertically integrated the capability to manufacture this gear in-house through Crusoe Industries. This brings down our lead time by 40%. Crusoe is now one of only three approved manufacturers in the U.S. for this kind of ABB gas insulated switchgear.
顯示更多
0
14
229
14
轉發到社區