註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

Lacey
@LaceyPresley
First principles: Imagine Mars. Build it. | AI Futurist | Multiplanetary Systems I SpaceXAI I Tesla scale I
加入 August 2025
507 正在關注    12.8K 粉絲
The Grimes County deal does not merely reduce taxes. It rewrites the marginal cost of scaling. A $20 million annual M&O cap on a planned $55 billion Terafab produces a $2.85 billion cumulative discount over 35 years 91.3 % savings against the $3.56 billion that would have been owed at a standard 0.45 % rate with 8 % depreciation. Under the $5 billion minimum commitment the same cap saves only $69.5 million. Every additional dollar of silicon, cleanroom, and tooling beyond the floor therefore carries an effective tax rate approaching zero. This is deliberate policy architecture: the county receives near-standard revenue on the minimum build while removing the tax penalty on maximal physical footprint. The incentive points in one direction build the largest possible compute and manufacturing base on Texas soil. @SpaceX @SpaceXAI
顯示更多