註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

Photon Capital
@PhotonCap
Seeing tech through a different wavelength. Photonics & semiconductor research
加入 April 2025
2.1K 正在關注    64.7K 粉絲
- IonQ $IONQ announced that its Superion 256 will be deployed at the NVIDIA $NVDA Accelerated Quantum Research Center, or NVAQC, becoming the center's first on-premise QPU deployment. - Superion 256 will be directly connected to an NVIDIA ($NVDA) GB200 NVL72 system through NVQLink, while hybrid quantum-GPU workloads will be orchestrated using CUDA-Q. - The joint research program will focus on hybrid quantum-classical software, large-scale system prototyping, and AI-QPU co-design, with plans to generate open research results and guidance for future system architectures. - Target research areas include portfolio optimization and risk modeling in financial services, materials science, and computational chemistry for drug discovery. - $IONQ introduced Superion on September 8, 2026. Superion 256 is currently available to order, with first customer deliveries expected in 2027, and the NVAQC installation is also scheduled for 2027. - $IONQ says its roadmap extends toward 10,000 qubits and full fault tolerance, supported in part by vertical integration involving its SkyWater CMOS foundry capabilities. - The companies had previously conducted CUDA-Q-based research with Oak Ridge National Laboratory and the University of Tennessee combining generative AI with distributed quantum algorithms. > The important point is not simply that NVIDIA will "use an IonQ QPU." The Superion 256 is intended to physically sit alongside GB200 NVL72 and connect through NVQLink and CUDA-Q as part of a heterogeneous computing system. > NVIDIA's quantum architecture direction is becoming clearer. Rather than treating GPUs and QPUs as isolated computers, it is pushing toward tightly coupled accelerated computing similar in principle to CPU-GPU integration, and $IONQ will become the first QPU provider to test that model inside NVAQC. > For $IONQ, placing Superion 256 inside NVIDIA's research infrastructure ahead of expected 2027 customer deliveries is a meaningful reference deployment. However, this remains primarily a research and large-scale prototyping program, so it is better viewed as strategic validation for quantum-GPU integration rather than evidence yet of large commercial revenue or exclusive NVIDIA adoption.
顯示更多