Neutron’s Stage 2 and Thrust Module have arrived to Virginia. After a short barge ride from the Neutron Factory, these major assemblies have now been offloaded on Wallops Island and are going through arrival checkouts.
Next up: integrated fluids testing and launch mount interface checkouts for the Thrust Module, with Stage 2 to follow on the test stand beside it soon after.
顯示更多