註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

SpaceGhost
@SpaceGhost_42
Software Engineer, Space Enthusiast 🚀🥼
加入 December 2024
147 正在關注    1.3K 粉絲
So somewhere between 2x and 3x the total R+D spend on Neutron (including production lines)? 1.3B and they still need structures, pad/infrastructure, grounds ops, software, etc? Conservatively Neutron will fly next year and be at full rate production in about the same time frame at under $500m total spend. Congrats on the smokin hot deal and good luck with the test flight in 2032.
顯示更多
$ASTS, we basically just got the hardest part of $RKLB's Neutron programme for $1.2bn....