註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

William David
@WDChokepoint
Physical reality constrains digital ambition. That gap is the investment thesis. Critical minerals. Semiconductors. Energy. The constraint always moves.
加入 May 2026
249 正在關注    309 粉絲
GE Vernova has 122 gigawatts of gas turbines under contract. 58 of them are reservations, not orders. A turbine ordered today commissions around 2032. The election may slow who orders next. It doesn’t move that date.
顯示更多