註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

The Boring Company
@boringcompany
Beat the snail
加入 May 2017
10 正在關注    1.2M 粉絲
Prufrock builds tunnel rings fully autonomously. Six concrete segments (~3,750 lb each), are lifted, translated and placed into final position. That's the weight of a Tesla Model 3, placed with millimeter precision in < 1 minute, monitored remotely from the Global OCC in Texas.
顯示更多
0
266
7.9K
671
轉發到社區