註冊並分享邀請連結,可獲得影片播放與邀請獎勵。

Jukan
@jukan05
加入 September 2024
453 正在關注    226.8K 粉絲
TrendForce: GPU lead times are 30–45 weeks, with the upper end of the range up 5 weeks from the previous week. DRAM lead times have shortened to 19 weeks, down 1 week from the previous week. MLCC lead times have extended to 38 weeks, up 3 weeks from the previous week.
顯示更多
0
35
557
66
轉發到社區