注册并分享邀请链接,可获得视频播放与邀请奖励。

ChromeKiwi
@AshleyKillip
Weather-Mechanical Engineering-Railway's-Aviation-Pc games-Heavy Equipment-Lighting Tech-Space-3d printing-Photography 7DMk1-Car Audio Installer
加入 May 2009
1.3K 正在关注    4.8K 粉丝
S43.1 at Massey's, with an impressive array of equipment rigged up inside the structural test cage. A large beam placed over the top supports four hydraulic cylinders linked to catch/lift hardware (yellow arrows). Another cylinder is pinned to a beam, applying loads to one side of the cone (orange arrow). Two frames are linked to the flap hardware for applying forces on the linkage hardware (red arrows). A pair of chopstick simulator beams apply a clamp force to the 9-meter tank section (green arrows). Internally, a large trapezoid frame is likely testing the Pez dispenser base frame that attaches to the forward dome, possibly testing forces it would see during a fully loaded Starlink v3 mission. Thanks to @MarcusHouse @lifeatstagezero for the progress shots.
显示更多
0
4
259
23
转发到社区