注册并分享邀请链接,可获得视频播放与邀请奖励。

William David
@WDChokepoint
Physical reality constrains digital ambition. That gap is the investment thesis. Critical minerals. Semiconductors. Energy. The constraint always moves.
加入 May 2026
249 正在关注    309 粉丝
GE Vernova has 122 gigawatts of gas turbines under contract. 58 of them are reservations, not orders. A turbine ordered today commissions around 2032. The election may slow who orders next. It doesn’t move that date.
显示更多