注册并分享邀请链接,可获得视频播放与邀请奖励。

Jukan
@jukan05
加入 September 2024
453 正在关注    227K 粉丝
TrendForce: GPU lead times are 30–45 weeks, with the upper end of the range up 5 weeks from the previous week. DRAM lead times have shortened to 19 weeks, down 1 week from the previous week. MLCC lead times have extended to 38 weeks, up 3 weeks from the previous week.
显示更多
0
35
557
66
转发到社区