September was a big month for test operations across our sites.
📍 NASA Stennis, MS
Stage 2 completed its first wet dress rehearsal! The team put the stage through flight-like propellant loading, COPV fills, engine chill operations, and a simulated stage 1 ascent timeline, building toward its first integrated hot fire.
📍 Long Beach, CA
All 13 Aeon R engines are installed on the thrust structure and are moving through integrated gimbal testing, validating their ability to pivot precisely to steer and stabilize the vehicle during flight.
显示更多