Register and share your invite link to earn from video plays and referrals.

Search results for Bitdeer
Bitdeer community
One keyword maps to one global community path.
Create community
People
Not Found
Tweets including Bitdeer
BitDeer is deploying 7MW of homemade ASICS at Soluna's wind-powered Dory Creek Texas data center, bringing total to deployment at the site to 35MW or 2.42EH/s. BTDR supplies machines, Soluna supplies site, power and operations with revenues splitting mining proceeds 50/50 SLNH: Soluna, Bitdeer expand agreement to 35 MW at Project Kati 1 Soluna Holdings (SLNH) announced an amended agreement with Dory Creek, a wholly owned subsidiary of Bitdeer Technologies Group (BTDR). Under the amendment expanding the partnership, Bitdeer will deploy approximately 7 MW of additional Bitcoin mining equipment at Soluna's Project Kati 1 in South Texas, bringing its total deployment at the site to 35 MW and approximately 2.42 EH/s of hash rate. Hash rate is measured in exahashes per second and reflects the computing power dedicated to Bitcoin mining. This marks the first expansion of the partnership and is expected to be complete in November 2026. Project Kati 1 is an 83 MW wind-powered data center in Willacy County, Texas. The Bitdeer deployment is located in the site's K1BC phase, which is now fully subscribed. The agreement takes the form of a co-mining arrangement, a structure Soluna introduced to its Bitcoin platform in August. Soluna provides the site, power, and turnkey operations; Bitdeer provides and owns its Sealminer A2 Pro Air mining equipment, and the parties share in the mining proceeds the deployment generates. The amendment carries the same structure as the original agreement.
Show more
Bitdeer sold 100% of the Bitcoin it mined last week. The publicly traded miner disclosed it mined 293 $BTC and retained zero in their reserves.
@Bitdeer's investment in #Massillon#, #Ohio# goes beyond the project site. We’re supporting the SAM Center, a dedicated regional organization that supports local veterans through food pantries, therapy services, and lodging kits that help veterans transition out of homelessness. 🙌 📹 Hear from the SAM Center's Executive Director, Adriana Lucia Cirese:
Show more
Bitdeer #BTC# Weekly Update 🔹 BTC Holdings: 0 (pure holdings, excluding customer deposits) 🔹 BTC Output: 263.4 BTC 🔹 BTC Sold: 263.4 BTC 🔹 Net BTC Added: 0 BTC 📅 Data as of August 14, 2026. #Bitcoin# #BTC# #BitcoinHoldings# #BitcoinCommunity# #BTCMining# $BTDR
Show more
Bitdeer strongly supports Texas Governor Greg Abbott’s drive towards standards and guidelines for data centers. It reflects our own long-standing commitment to being a responsible, community-first digital infrastructure developer. Since starting operations in Rockdale, Texas in 2019, Bitdeer has held itself to high standards of transparency and being a good neighbor. It’s a model we have adopted wherever we operate - building sustainably through thoughtful engineering, paying our own way and actively supporting the grid, stewardship of local water resources, hiring locally and expanding the local tax base. We will work with the Public Utilities Commission of Texas (PUCT) and the Electric Reliability Council of Texas (ERCOT) to ensure that our development strengthens, and is not at the expense of local communities and families. For more info, please visit
Show more
Bitdeer #BTC# Weekly Update 🔹 BTC Holdings: 0 (pure holdings, excluding customer deposits) 🔹 BTC Output: 270.5 BTC 🔹 BTC Sold: 270.5 BTC 🔹 Net BTC Added: 0 BTC 📅 Data as of August 7, 2026. #Bitcoin# #BTC# #BitcoinHoldings# #BitcoinCommunity# #BTCMining# $BTDR
Show more
@Bitdeer has executed a 16-year #AIDC# colocation lease for Tydal, Norway 🇳🇴 Campus with Volta, an @nvidia Cloud Partner. 🤝 ~$4.7B in contracted base-term revenue, with the potential to reach $8B over 24 years. ⚡️ 121 IT MW configured to run #NVIDIA# GPUs for a leading AI lab, with @Dell as the #technology# provider. ♻️ 100% renewable energy with ~1.1 PUE, TDC expected to be among Norway's most efficient #AIInfrastructure# upon completion. 🛡️ Anticipated credit backstop totaling ~$1.3B, arranged via Letter of Credit by affiliates of @jpmorgan and another top-tier global financial institution. Read the full details here: $BTDR #Bitdeer# #datacenter# #gpu#
Show more
Bitdeer #BTC# Weekly Update 🔹 BTC Holdings: 0 (pure holdings, excluding customer deposits) 🔹 BTC Output: 271.3 BTC 🔹 BTC Sold: 271.3 BTC 🔹 Net BTC Added: 0 BTC 📅 Data as of July 31, 2026. #Bitcoin# #BTC# #BitcoinHoldings# #BitcoinCommunity# #BTCMining# $BTDR
Show more
Bitdeer unveils the new Sealminer A4 Ultra Hydro, a Bitcoin ASIC with 1 petahash (1 quadrillion calculations/s).
Bitdeer #BTC# Weekly Update 🔹 BTC Holdings: 0 (pure holdings, excluding customer deposits) 🔹 BTC Output: 194.4 BTC 🔹 BTC Sold: 194.4 BTC 🔹 Net BTC Added: 0 BTC 📅 Data as of June 12, 2026. #Bitcoin# #BTC# #BitcoinHoldings# #BitcoinCommunity# #BTCMining# $BTDR
Show more