The first half of the 20th century saw exponential growth in electricity demand in America, and so we built the largest synchronous machine on the planet. This exponential growth is back. Enormous new productive load is being connected to the grid and new generation, transmission, and storage capacity is needed to make, move, store, and ultimately sell energy to people at an affordable price.
ERCOT is leading the way with the ADER program, and the introduction of Phase IV is creating a powerful new tool to help meet these needs.
@cpatdowling , our founding power systems engineer, outlined how what’s happening in Texas can help solve the capacity crunch: