Founder of Valora Investment Group LLC. Generalist investor with a preference for energy, manufacturing and hard-assets.
$CSIQ $EOSE $LODE Not Financial Advice
$CSIQ EāSTORAGE TO SUPPLY AND COMMISSION 100 MW/200 MWH BATTERY STORAGE SYSTEM FOR OX2 IN NEW SOUTH WALES
Most importantly, $CSIQ is being responsible for supplying EVERYTHING in this project. BESS Containers, in-house cells, power conversion systems, software, grid connection studies, EPC and long-term service agreements:
āThe battery cells and SolBank system will be produced in-house at Canadian Solar's manufacturing facilitiesā
āeāSTORAGE will deliver an integrated solution built on SolBank 3.0 battery containers, paired with Power Conversion Systems (PCS), plant controls, and the Company's proprietary EQ-S Energy Management System (EMS) developed and built in-house by eāSTORAGE's North American software team. eāSTORAGE will be responsible for the R1 grid connection studies, supply the hybrid power plant controller that coordinates the battery with the co-located solar farm, and lead the overall integration and commissioning of the hybrid project. The arrangement is backed by a 20-year long-term service agreement (LTSA), placing hardware, proprietary software, and long-term performance under a single accountable partner.ā
This is a show of how a leading, vertically integrated BESS company wins.