Register and share your invite link to earn from video plays and referrals.

Mike Baier
@Mike__Baier
Removing traffic from the world one tunnel at a time. Director of Production, Electrical, and Software Engineering at The Boring Company
Joined March 2020
762 Following    7K Followers
VC7 is built to be a workhorse. Almost every part of it has been improved over the previous generation.
Introducing Vertical Cassette 7 (VC7), our latest generation of continuous conveyor which transports muck/rock from the TBM to the surface. - Height: 37 ft - Weight: ~220,000 lb - Max muck conveyance rate: 990 tons/hour (w/ 50% loaded belt) - Max supported TBM advance rate: 4 miles/week - Min Radius of Curvature: 500 ft (see 0:12 of video for a tight curve; maneuverability is critical in urban settings) - Belt speed: 660 ft/minute - Supported tunnel length: infinite (w/ "Belt Boosters" every 1.5 miles) - 650+ improvements from VC6 focusing on setup speed, reliability, and power efficiency Fun fact: for every 15 inches the machine mines, ~1 dump truck of material is generated!
Show more