Register and share your invite link to earn from video plays and referrals.

Mike Baier
@Mike__Baier
Removing traffic from the world one tunnel at a time. Director of Production, Electrical, and Software Engineering at The Boring Company
Joined March 2020
762 Following    7K Followers
Help us build the future.
Prufrock builds tunnel rings fully autonomously. Six concrete segments (~3,750 lb each), are lifted, translated and placed into final position. That's the weight of a Tesla Model 3, placed with millimeter precision in < 1 minute, monitored remotely from the Global OCC in Texas.
Show more