Drone footage of Prufrock-MB1 and Prufrock-MB2 tunneling simultaneously in Nashville.
The 10,000+ psi limestone is transported from each boring machine via a continuous conveyor belt, completing its journey to the rock pit via the 2 vertically stacked side belts seen below.