Register and share your invite link to earn from video plays and referrals.

The Boring Company
@boringcompany
Beat the snail
Joined May 2017
10 Following    1.2M Followers
Vegas Loop isn’t just tunnels! In Vegas, besides 14 tunnels, TBC has built 14 stations (28 by end of year), 12 emergency egresses, 6 cross-passages, and 9 "knockout shafts". See below for the construction of a cross-passage connecting "Tunnel-1" and "Tunnel-2" (beneath Paradise Road) to provide access and egress; construction time is ~10 days. Steps: 1. If necessary, treat the ground (typically with grout) between the two tunnels such that it is stable during excavation. 2. Brace the Tunnel-1 wall with a steel frame and open up the concrete Tunnel-1 wall within said frame. 3. Excavate the dirt between the tunnels, installing steel ribs and wood lagging to maintain a safe roof until Tunnel-2 is exposed. This is a slow process of 10 feet per day. 4. Install waterproofing and rebar, the latter which anchors into both Tunnels 1 and 2 (see pic) 5. Install solid steel liner plate (see pic) 6. Pour high-strength concrete around the liner plate, reinforced with the rebar from Step 4 7. Open up Tunnel-2, finalizing the connection Finally, the cross-passage is built out with a walking surface, ventilation, fire suppression valves, fire-rated doors, safety equipment/sensors, lighting, and cameras.
Show more
0
88
3.2K
291
Forward to community