Elon Musk says
@Tesla is undergoing “probably the fastest industrial scale-up since World War II in America.”
• Optimus Production lines:
- 1M/yr in Fremont
- 10M/yr in Texas (under construction)
• Autonomous Cybercab Production at Giga Texas: the second largest building in the world by volume.
• Terafab Semiconductor chip production in Texas (with memory) totaling 100M sqft!
• Ramping towards 400MW of total capacity at their Cortex 1 and 2 datacenters.
• Battery materials & cells:
- Lithium refining & cathode materials in Texas
- LFP cell production in Nevada
- 4680 cell production in multiple sites in Texas, and Nevada
• Solar Production:
- New solar factory building in Houston area
- Existing solar production factory in New York
Just wait.