SpaceX is aiming for faster turnaround times. After each launch, scaffolding is installed at the pad to service the OLM clamps. Recently,
@RGVaerialphotos spotted a new structure arriving by barge.
Based on the current scaffolding design, it will likely be lifted into place by the LR11000 crane using three lifting points on each leg. It hangs inside, supported by the top water-cooled pancake. Because of this, it is strictly an OLM service platform—the booster cannot be installed over the top.