Dear Commander,
The Oct Production Rate-up will be available from Oct. 1st - Oct. 31st UTC-8. And the Oct Anchored Construction will be available at the same time. During the event, the pull rates in normal production rate-up for Welrod MkII, MDR, SCAR-L, MG4, Boys AT Rifle, Mk.18, EF88, Stechkin, Shipka, Spitfire, K-PDW, CZ 100, ZiP .22, SSG M1 will be increased. The pull rates in heavy production rate-up for S.A.T.8 and SPAS-12 will be increased. Please refer to the following pictures for more details.
#
GirlsFrontline#