Cybercabs at Giga Texas continue tests on the track, today focusing on the various uneven road surfaces built for NVH testing on the inner oval. Some other Cybercabs are racing around the larger outer oval today too.
In the outbound lot, we see another grouping of Cybercabs getting ready for transport along with a line of Cybercabs near the EOL facility.
Not much action observed on the E side production line exit point at the time of my flight.
Enjoy the 1st day of fall with these views!