So somewhere between 2x and 3x the total R+D spend on Neutron (including production lines)?
1.3B and they still need structures, pad/infrastructure, grounds ops, software, etc?
Conservatively Neutron will fly next year and be at full rate production in about the same time frame at under $500m total spend.
Congrats on the smokin hot deal and good luck with the test flight in 2032.