False.
As of the end of February 2026, xAI proceeded with the installation of an array of 27 mobile gas turbines at the Southaven site.
Assuming these units are operational, they would provide a generating capacity of approximately 495 MW, effectively functioning as a large-scale power plant.
Assuming the incomplete data center is occupied and capable of fully utilizing the entire 495 MW of power, that capacity could support approximately 350,000 to 400,000 H100-equivalent GPUs.
Jensen last minute joined Trump’s trip to China to make sure the flow to Malaysia & Co. remains as usual, sorry, I mean, so he can finally clear Nvidia’s leftover H200 inventory. Or maybe move some of the GB200s sitting in warehouses? Blackwell already celebrated its first birthday It is the time to pitch it to China?