Assuming a full 460MW of critical IT, this deal prices 30% higher per MW per year than Anthropic's deal with Volta in Norway.
If 460MW is the full power and usual ~1.2x PUE, then it prices at $20M+/MW/year, 50% higher than the Volta/BTDR $12.5M/MW/year.
Same Vera Rubin chips.