Building the infrastructure to launch Terran R. September brought several key milestones across LC-16's launch pad and ground systems.
✔️ The east lightning protection system tower reached its full height of 530 feet.
✔️ Structural steel on the east side of the launch table is complete.
✔️ Permanent 480-volt power infrastructure energized at the pad.