Siemens Energy proposes to more than triple its dividend to $2.57 a share after a record fiscal 2026: revenue up 15.5% to $49.3B, orders up 18.8%, backlog at $183B, driven by grid and gas turbines. #SiemensEnergy# #GasTurbines# #Grid#
Gas Turbines and Datacenters
my TLDR is:
• Literally every turbine (even the inefficient ones) are sold out through 2030.
• Prices are 3x those from 2019. Slot times are more valuable than the cost efficiency.
• Turbine OEM's were burned out from a buildout from 2009–2014 when there was a huge rush due to the shale revolution, shift to use more gas due to Fukushima, coal retirements. For ex, GE Power imploded. Therefore, they have been slow to expand production.
• Four key bottlenecks for parts that go into a gas turbine:
1. Single-crystal castings: only 5 firms in the world do this
2. Heavy rotor forgings: only 4 firms do this
3. The casting furnaces themselves: 3 firms
4. GSU transformers: in the US, there's only one. Heron Power is building here, they raised $140 million in a Series B from a16z in Feb 2026.
Demand for natural gas turbines is outpacing manufacturing capacity, leading to increased wait times, according to one of the world’s top makers of the power generation equipment
GE VERNOVA SEES STRONGER GAS ORDERS AS TEXAS SMR PROJECT ADVANCES
$GEV expects gas capacity additions to grow about 50% by year-end, with second-half contract commitments now expected to exceed its 20GW guidance. Q4 commitments are also tracking above Q3 based on current trends.
Separately, Blue Energy has filed the first part of an NRC construction permit for a BWRX-300 small modular reactor at the Port of Victoria, Texas.
The planned site would combine GE Vernova’s BWRX-300 nuclear technology with its 7HA.02 gas turbines, giving $GEV exposure to both gas and nuclear generation at the same project.
Blue Energy expects to submit the remaining permit application in 2027.
MUSK TURNS TO NATURAL GAS TO POWER AI
Elon Musk is increasingly embracing natural gas to meet SpaceX’s massive AI power needs.
SpaceX plans a gas-fired power plant for its $16.8B Texas chip facility, while its Tennessee and Mississippi data centers already use dozens of gas turbines.
Musk expects data-center capacity to reach 10–15 GW by 2027, potentially making SpaceX America’s largest operator.
The strategy prioritizes rapid, off-grid power as AI electricity demand surges.
Anthropic $ANT bought $3.4B of gas generators capable of 1.7 GW, the largest known single power equipment purchase by an AI lab, by taking over orders OnePWR Solutions placed with Caterpillar $CAT two years ago.
That gets it equipment in the near term instead of waiting through long backlogs, part of a shift where AI companies bypass utilities, like SpaceX's $SPCX xAI buying $2B of mobile gas turbines and Alphabet $GOOGL buying energy developer Intersect.
It comes with nearly $900B of computing commitments through 2045, including monthly payments to SpaceX expected to reach $3.1B by year-end.
GE Vernova has 122 gigawatts of gas turbines under contract. 58 of them are reservations, not orders. A turbine ordered today commissions around 2032. The election may slow who orders next. It doesn’t move that date.