Register and share your invite link to earn from video plays and referrals.

Amy
@Amy787
TSLA investor, After IPO 2010–present. SPCX investor, IPO - present. B787 FO, (for now - B787 CA soon). If there isn’t a blue check—it isn’t me.
Joined September 2017
4K Following    24.9K Followers
Try to block access to the grid - and an Elon Musk company will just build and fund their own power.
SPACEXSI: SpaceX via Trinity Consultants filed TCEQ Air New Source Registration 185303 that seeks authorization under the Air Quality Standard Permit for Electric Generating Units for a power plant on the 444-acre site north of Hwy 4 near the Port of Brownsville. It covers the following: Initial (temporary) configuration: 35 natural-gas turbines totaling ~748 MW. These are temporary units to be removed as permanent ones come online. They are described as used/refurbished, so I expect these to come from the Colossus 2 campus: - 6× GE Vernova TM2500 (Plus) Gen 6 at 25.4 MW - 2× GE Vernova TM2500 (+G4) Gen 8 at 27.4 MW - 9× Mitsubishi FT8 at 27.1 MW - 18× Solar SMT-130 at 16.48 MW Final configuration: - 8× GE Vernova 7E at 88.56 MW each (~708 MW). Primary business listed as power generation, with a secondary SIC code for computer processing/data preparation services. That would be a Data Center. This buildout process will be similar, if not exactly, like the powerplant in Southaven, Mississippi.
Show more